TM 10-4130-239-14
b.
Unloading.
The crated unit should be placed as close as
possible to point of use before uncrating.
c.
Unpacking.
1 Place crated unit as close as possible to point of use.
2 Remove steel bands from top of crate, being careful not to
damage water chiller components.
3 Remove cardboard box containing kits from top of water
chiller.
4 Open cardboard box and remove contents.
5 Inspect all contents for damage.
NOTE
The cardboard box contains a duffle bag for
storing components of support kit after removal
from packing box.
Select components required
for installation from support kit.
Store spare
support kit components in duffle bag for later
use.
Check contents using Appendix C, Components of
End Item and Basic Issue Items Lists.
6 Check support kit contents.
These items are required for
setting up water chiller as operational unit.
7 Check contents of trailer mounting kit.
Do not remove from
shipping case until ready for installation.
8 Remove crating from around water chiller and remove hold-down
bolts from skid base.
9 Remove water chiller from crating and place at point of
operation.
d.
Checking Unpacked Equipment.
1 Inspect the equipment for damage incurred during shipment.
If the equipment has been damaged, report the damage on DD
364, Report of discrepancy.
2 Check the equipment against the packing slip to see if the
SF
- -
shipment is complete.
Report all discrepancies in accordance
with the instructions of DA PAM 738-750.
The Army
Maintenance Management System (TAMMS).
3 Check to see if equipment has been modified.
4-3
|