|
|
CHAPTER 3
OPERATOR AND ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Section I. OPERATOR AND ORGANIZATlONAL MAINTENANCE TOOLS AND EQUIPMENT
orized for the prefabricated refrigerator are
3-1. Special Took and Equipment
listed in the basic issue items list, Appendix B
No special tools or equipment are required
of this manual.
by the operator or organizational maintenance
personnel for the maintenance of the prefabri-
3-3. Organizational Maintenance Repair
cated refrigerator warehouse.
Parts
3-2. Basic Issue Tools and Equipment
Organizational maintenance repair parts are
listed and illustrated in Appendix D.
Tools and repair parts issued with or auth-
Section Il. LUBRICATION AND PREVENTIVE MAINTENANCE SERVICES
3-4. Lubrication
3-6. Daily Preventive Maintenance Services
The prefabricated refrigerator requires lu-
This paragraph contains an illustrated tab-
brication of the door hinges and latch only.
ulated listing of preventive maintenance serv-
Clean the hinges and latch with an approved
ices which must be performed by the operator
cleaning solvent and apply a lightweight oil
or crew. The item numbers are listed con-
sparingly as required.
secutively and indicate the sequence of min-
imum requirements. Refer to figure 31 for
3-5. Preventive Maintenance Services,
the daily preventive maintenance services.
General
3-7. Quarterly Preventive Maintenance
To insure that the prefabricated refrigerator
Services
is ready for operation at all times, it must be
inspected systematically, so that defects may be
a. This paragraph contains an illustrated
discovered and corrected before they result in
tabulated listing of preventive maintenance
serious damage or failure. The necessary pre-
services which must be performed by organiza-
ventive maintenance services to be performed
tional maintenance personnel at quarterly in-
are listed consecutively and are described in
t e r v a l s . A quarterly interval is equal to 3
calendar months or 250 hours of operation,
indicate the sequence of minimum inspection
whichever occurs first.
requirements.
Defects discovered during op-
b. The item numbers are listed consecutively
eration of the unit shall be noted for future
and indicate the sequence of minimum require-
correction, to be made as soon as operation has
ments. Refer to figure 32 for the quarterly
ceased. Stop operation immediately if a de-
preventive maintenance services.
ficiency is noted during operation which would
damage the equipment if operation were con-
3-8. General
tinued. All deficiencies and shortcomings will
be recorded together with the corrective action
The instructions in this section are pub-
taken on DA Form 2404 (Equipment Inspec-
lished for the information and guidance of
tion and Maintenance Worksheet) at the ear-
the operator to maintain the prefabricated
liest possible opportunity.
refrigerator.
3-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |