|
|
TM 5-4110-217-14
CHAPTER 2
OPERATING INSTRUCTIONS
Section I. OPERATING PROCEDURES
2-1. Unloading the Equipment.
NOTE
Do no destroy the shipping crate as t is
The refrigeration unit is shipped in a crate which has
designed for re-use.
a skid pallet base (fig. 21). It should be handled with
fork lift equipment, but may be handled by crane and
2-2. Unpacking the Equipment.
sling. Reasonable precaution should be taken to prevent
damage by shunting or bumping.
The refrigeration unit (fig. 21) is secured in the
shipping crate by two uprights with two horizontal
Figure 2-1. Unpacking Refrigeration Unit
2-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |