|
|
TM 5-4110-240-13&P
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
2.
PILOT LIGHT WORKS, VAPOR PROOF LIGHT FAILS, WHEN SWITCH IS SET TO ON.
Step 1.
Use an ohmmeter to check continuity of wire between pilot light socket and vapor
proof light socket.
Organizational Maintenance.
Step 2
Use an ohmmeter to check continuity of wire between vapor proof light socket and
receptacle.
Replace wire, if defective, in accordance with instructions in Section V.
Organizational Maintenance Procedures.
Step3.
Test vapor proof light socket using instructions in Section V, Organizational Maintenance
Procedures.
Replace vapor proof light socket, if defective.
Change 2 4-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |