|
|
STEP 2. CONNECT HOSE FROM REFRIGERANT CHARGING HOOKUP LOOSELY
TO SUCTION TUBE SERVICE VALVE. OPEN REFRIGERANT DRUM
SHUTOFF VALVE SLIGHTLY TO PURGE HOSE. TIGHTEN CONNECTION
AT SERVICE VALVE. OPEN SHUTOFF VALVE AND OPEN SUCTION
SERVICE VALVE.
NOTE: REFRIGERANT DRUM MUST BE IN UPRIGHT POSITION TO ALLOW
ONLY GASEOUS REFRIGERANT TO ENTER SYSTEM.
STEP 3. CLOSE THE DRUM SHUTOFF VALVE WHEN THE DISCHARGE PRESSURE
GAGE REACHES 10 PSIG. CLOSE SUCTION SERVICE VALVE AND
DISCONNECT HOSE FROM VALVE.
Figure 5-26-Continued. (Sheet 2 of 3)
AGO 20053A
65
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |