Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

b.   Installation.   Install   high   and   low   pressure cutout   switches   as   follows: (1)  Insert  capillary  tube  ends  through  par- tition  and  install  grommet   (fig.   5-7).   Connect capillary   tube   nuts   to   fittings. (2)  Install   switches   (fig.   4-21)   and   secure   each with   two   screws   and   lock   washers. (3)  Make  electrical  connections  to  switches. (4)  Refer   to   paragraph  4-54   and   install junction  box.  Refer  to  paragraph  4-21  and  install housing   top   cover. (5)  Refer  to  paragraph  6-3  and  charge  the refrigerant   system. 5-22.  Charging  Valves a. Removal. Refer to paragraph 6-3 and discharge   the   refrigerant   system.   Remove   housing rear  top  covers  (para  4-21).  Remove  cap  and  nut from   each   charging   valve   (fig.   5-7).   Unsolder charging   valves   from   line. b.  Installation.   Install   charging   valves   on   line and   solder.   Place   valves   in   slot   in   support   bracket and   secure   each   with   nut.   Install   caps.   Refer   to paragraph   4-21   and   install   housing   rear   top   cover. Refer   to   paragraph   6-3   and   charge   the   refrigerant system. 5-23.   Pressure   Relief   Valve a.  Removal.   Refer   to   paragraph   6-3   and discharge   the   refrigerant   system.   Refer   to paragraph   4-21   and   remove   housing   top   covers. Remove  screw,  lock  washer,  and  loop  clamp  (fig.  5- 7).   Remove   pressure   relief   valve   from   adapter. b.  Installation.   Install  pressure  relief  valve  (fig. 5-7)   in   adapter.   Install   loop   clamp   on   valve   and secure  clamp  with  screw  and  lock  washer.  Install housing  top  cover  (para   4-21).   Refer   to   paragraph 6-3   and   charge   the   refrigerant   system. 5-24.   Dehydrator a.  General.   The  dehydrator  is  to  be  replaced whenever  the  refrigeration  system  is  opened  for maintenance. b.   Removal.   R e f e r    t o    p a r a g r a p h    6 - 3    a nd discharge the   refrigerant system. Refer   to paragraph   4-21  and  remove  housing  rear  top  cover. Refer  to  figure  5-8  and  remove  four  screws  and  two straps.   Disconnect   and   remove   dehydrator. c.  Installation.  Connect   dehydrator   to   tubing. Install  two   strap   and   four  screws.   Use   sealing compound   on   screw   threads.   Install   rear   top   cover (para  4-21).  Refer  to  paragraph  6-3  and  charge  the refrigerant   system. 5-13

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business