Click here to make tpub.com your Home Page

Page Title: Cleaning and Inspection.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

(3) Left-Side Panel, Rear Panel, and Top Panels.
(a) Remove fasteners from respective panels and remove them
from the unit.
b.
Cleaning and Inspection.
(1) Clean all panels with soft cloth dampened with cleaning fluid
(2) Inspect the panels for cracks, breaks, damaged louvers, de-
fective insulation, or missing hardware.
(3) Repair or replace damaged or unserviceable panels, insulation
or missing fasteners.
c. Installation.
(1) Rear panels, left-side panel, and top panels. Position the
respective panel on the unit and secure with the screws.
(2) Front Panel.
(a) Install the front removable frame over the rear of the
front panel.
(b) Install the thermostat, selector switch, and fresh air
damper control in the front panel.
(c) Position the front panel and front removable frame on the
unit and secure with the screws.
(d) InStall the front instruction plate.
(e) Install the central knobs.
(f) Install. the fresh air control linkage.
(3) Right-Side panel.
(a) Position the right-side panel on the frame and install with
fasteners.
(b) Connect the power source wire assembly to the power Plug.
Section VI. ELECTRICAL SYSTEM
40. General
The electrical system of the air conditioner operates on 115 v, 60
cycle current only, and requires a power supply with a minimum 1.7 kw

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business