drained storage location, protected from prevailing winds. Position
the air conditioner on heavy planking. Cover the air conditioner with
a tarpaulin or other suitable waterproof covering and secure in a
manner that will provide the air conditioner maximum protection from
the elements.
59. Inspection and Maintenance of Equipment in Storage
a. Every 90 days, the air conditioner will be inspected as outline
on the Quarterly Preventive Maintenance Services chart (fig. 8) and op
erated long enough to assure complete lubrication of bearings.
b. After each inspection period, the air conditioner shall be re-
preserved as outlined in paragraph 58.
|