Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 5-17, Check valve, remval and installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Figure   5-17, Check  valve,  remval  and  installation. d.  Installation. (1)  Install   the  check   valve   in   the   reverse order of removal. (2)   Refer   to   paragraph   6-3   for   soldering procedures. (3)   Pressure   test,   evacuate,   and   recharge the  refrigerant  system  (para  6–5). 5-29.   Accumulator   Tanks a.  General.  The   accumulator   tanks   are   in- stalled  in  the  system  to  permit  low  ambient  tem- perature  operation  by  supplying  additional  liquid refrigerant  to  the  evaporator  coil. b. Removal. (1)  Discharge  the  refrigerant  system  (para 6-3). (2)  Refer  to  figure  3-4  and  remove  the  top access cover. (3)  Refer  to  paragraph  5-17  and  remove  the evaporator  expansion  valve. (4)  Remove  the  evaporator  expansion  valve bracket  from  the  top  partition  panel  (fig.  5-16). (5)   Disconnect   electrical   heater   element plug  at  top  partition  panel  (fig.  5-18). (6)   Refer   to   figure   5-18   and   remove   the tank. c.   Installation. (1)  Install  the  tank  in   the  reverse  order  of removal. (2)   Refer   to   paragraph   6-3   for   soldering procedures. (3)   Pressure   test,   evacuate,   and   recharge the  refrigerant  system  (para  6–5). 5-30.   Refrigerant   Receiver a.  General.  The   refrigerant   receiver   is   con- nected  to  the  inlet  and  outlet  lines  of  the  con- denser  coil  and  serves  as  a  storage  tank  for  liquid refrigerant. b.  Removal. (1)  Discharge  the  refrigerant  system  (para 6-3): (2)  Remove  the  junction  box  (para  3-24). (3)  Refer  to  figure  5–19  and  remove  the  re- frigerant   receiver. c. Installation. (1)   Install   the   refrigerant   receiver   in   the reverse order of removal. (2)   Refer   to   paragraph   6-3   for   soldering procedures. (3)  Pressure  test,  evacuate,  and  recharge  the refrigerant   system   (para   6-5). 5-22

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business