| |
Figure 5-18. Accumulator tank removal and installation
5-31. Subcooler
receiver prior to flowing through the check valve.
a. General. The subcooler, an integral part of
b. Removal and Installation. Refer to para-
the condenser coil, is installed in the system to
graph 5-10 and remove and replace the condenser
subcool the warm liquid refrigerant leaving the
coil.
5-23
|