|
|
TM 5-4120-341-13
This task covers:
c. Repair
a Removal
d Installation
b. Inspection
INITIAL SETUP
Troubleshooting Reference
MaterialPam
Right Side Panel Screws (17)
FANS, Malfunction 1, Step 3
Top Center Panel Screws (10)
AlR OUTPUT, Malfunction 2, Step 3
Return Air Grill Screws (8)
NOISE, Malfunction 1, Step 2
Air Diffuser Grill Screws (8)
Control Panel Plate Screws (2)
Front Panel Screws (14)
Blower Intake Ring Screws (7)
Approximate Time Required (in minutes)
Fan Motor CapsCrews (4)
Fan Motor Self-Locking Nuts 4)
Removal
Thermostat Switch Screws (2)
Inspection and Repair
Installation
References
80
TOTAL TIME
ACTION
REMARKS
LOCATION/lTEM
RIGHT SIDE AND TOP OF HOUSING
Remove seventeen (17) screws securing right
a
1. Right Side Panel
side panel.
Remove right side panel,
b.
a.
Remove ten (10) screws securing top center
2. Top Center Panel
b. Remove top center panel.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |