Click here to make tpub.com your Home Page

Page Title: REFRIGERANT PIPING AND SERVICE VALVES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-341-13
5-10. REFRIGERANT PIPING AND SERVICE VALVES
This task covers:
c. Repair
a Removal
d Installation
b. Test
INITIAL SETUP
Troubleshooting Reference
Material/Parts
AIR CONDITIONER, Malfunction 5, Step 2
Top Center Panel Screws (10)
Top Front Panel Screws (7)
Top Rear Panel Screws (9)
Right Side Panel Screws (17)
Rear Panel Screws (14)
Left Side Panel Screws (17)
Return Air Grill Screws (8)
Air Diffuser Grill Screws (8)
Approximate Time Required (in minutes)
Control Panel Plate Screws (2)
Front Panel Screws (14)
Removal
Testing and Repair
Installation
References
TOTAL TIME
REMARKS
ACTION
LOCATION/lTEM
TOP AND LEFT SIDE OF HOUSING
Remove ten screws securing top center panel.
a.
1. Top Center Panel
b.
Remove top center panel.
a.
Remove seven (7) screws securing top front
2. Top F rent Panel
panel.
b.
Remove top front panel.
Remove nine (9) screws securing top rear
a.
3. Top Rear Panel
panel.
b.
Remove top rear panel.
a.
Remove seventeen (17) screws securing left
4. Left Side Panel
side panel.
Remove left side panel.
b.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business