|
|
TM 5-4120-341-13
This task covers:
c. Repair
a. Removal
d. Installation
b. Test
INITIAL SETUP
References
Material/Parts
Top Center Panel Screws (10)
Top Front Panel Screws (7)
Top Rear Panel Screws (9)
Troubleshooting Reference
Right Side Panel Screws (17)
Rear Panel Screws (14)
Left Side Panel Screws (17)
Thermostat Switch Screws (2)
Selector Switch Screws (2)
Approximate Time Required (in minutes)
Control Panel Plate Screws (2)
Front Panel Screws (14)
Removal
Test
Condenser Shroud Screws (2)
Repair
Frame Screws (8)
Installation
Evaporator Coil Screws (6)
TOTAL TIME
790
Evaporator Coil Screws (4)
REMARKS
ACTION
LOCATION/lTEM
,
TOP AND LEFT SIDE OF HOUSING
Remove ten (10) screws securing top center
1. Top Center Panel
a.
panel.
Remove top center panel.
b.
Remove seven (7) screws securing top front
a.
2. Top Front Panel
panel.
Remove top front panel.
b.
Remove nine (9) screws securing top rear
a.
3. Top Rear Panel
panel.
Remove top rear panel.
b.
a.
Remove seventeen (17) screws securing left
4. Left Side Panel
side panel.
Remove left side panel.
b.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |