|
|
TM 5-4120-352-14
tighten setscrew.
c. A ssem bly.
(6) Control Module. After components have
been installed, make all necessary electrical con-
any components that were removed. Complete the
nections. Insert capillary tube bulb through open-
assembly as described in (6) below.
ing in cover. Install cover and mounting screws. In-
(2) Circuit Breaker. Install circuit breaker,
stall capillary tube grommet.
screws and washers. Assemble handle spacers and
d. Installation.
shaft.
(1) Install temperature selector switch bulb
(3) Evaporator Fan Toggle Switch. Install
and tube through slot in junction box. Install bulb
toggle switch and secure to mounting plate with
in clamps (fig. 4-16) and tighten screws,
switch nut and lockwasher.
(2) Install control module into junction box
(4) Temperature Selector Switch. Install
and turn connector knob clockwise until screw is
switch and secure with four screws, washers, and
tight.
nuts. Install switch knob. Install clamp on capillary
tube and secure clamp with nut.
air inlet louver.
(5) Mode Selector Rotary Switch. Install
switch and secure with switch nut. Install knob and
MAINTENANCE OF JUNCTION BOX
Section XVI.
4-43. Junction Box.
curing junction box to housing. Partially remove
The junction box (Fig. 1-1) contains the time
the junction box by pulling the box forward and out
of the air conditioner. See figure 4-18. Support the
relay, heater relay, and the compressor motor relay.
junction box to relieve strain on wiring.
a. Removal.
(3) To completely remove the junction box it
is necessary to disconnect all the electrical leads
cover. Refer to paragraph 4-42 and remove control
and connectors.
module.
4-36
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |