|
|
TM 5-4120-352-14
tion box.
4-46. Rectifier.
a. Removal. Remove rectifier as follows:
(1) Refer to paragraph 4-43 and remove junc-
4-47. High and Low Pressure Cutout
tion box.
Switches.
a. General. The high and low pressure cutout
pacitors. Disconnect leads.
switches cannot be removed without opening the re-
(3) Remove two cap screws and remove recti-
frigeration syste,. Electrical tests should be made
fier.
with the switches installed.
b. Testing. Apply a 30 volt ac source of power
b. Testing. Test switches as follows:
across the no. 1 and 3 terminals. Check for 24 to 28
volt dc output across terminals 2 and 4. Replace rec-
tion box.
tifier if defective.
across terminals of switch. If no continuity is indi-
rectifier as follows:
cated, press reset button and recheck.
(1) Install rectifer and two cap screws.
(3) If switch is defective, report condition to
(2) Connect leads and install capacitors: the
direct support maintenance.
.056 mfd capacitor between rectifier terminals 1
(4) If switch is not defective, connect leads
and 3; the 10,000 pfd between terminals 2 and 4.
and install junction box.
Section XVIII. MAINTENANCE OF COMPRESSOR
4-48. General.
4 - 4 9 . Inspection, Testing and Repair.
Organizational maintenance of the compressor is
top cover.
limited to the inspection, testing and repair of the
electrical equipment.
connector.
4-42
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |