Click here to make tpub.com your Home Page

Page Title: Pressure Switches.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-352-14
(1) Close louver blades and tighten screw in
(4) Remove screw, lock washer and loop
mechanical post to lock wire on that end.
clamp.
(2) Extend actuator rod until there is a 1/4
(5) Remove control casing outer nuts at each
inch space between inner edge of mechanical post
end and remove push-pull control.
bracket and the face of the cylinder. Tighten the
(6) Disconnect elbow swivel nut from end of
mechanical post screw.
actuator cylinder.
(3) Refer to figure 4-5 and install housing top
(7) Remove two nuts and lock washers from
covers.
evaporator side of partition and remove actuator
(4) Refer to figure 6-2 and charge the refrig-
cylinder.
erant system.
b. Installation. Install actuator cylinder and
control as follows:
(1) Install actuator cylinder (fig. 5-6) with
studs through openings in partition. Install lock
a. Removal. Remove pressure cutout switches
washers and nuts on studs.
(fig. 4-20) as follows:
(2) Connect elbow swivel nut.
(1) Refer to figure 6-1 and discharge the re-
(3) Install push-pull control. Place outer con-
frigeration system.
trol casing nuts (fig. 5-5) over wire and insert wire
(2) Refer to paragraph 4-43 and remove junc-
ends into openings in mechanical posts on louver
tion box. Disconnect electrical leads. Refer to figure
lever and actuator cylinders.
4-5 and remove housing rear and center top covers.
(4) Install control casing nuts on casing to
(3) Remove two mounting screws and lock
hold control in position. Install loop clamp, screw,
washers from each switch.
and lock washer.
(4) Refer to figure 5-7 and disconnect capil-
(5) Adjust control as described in c below.
lary tube nuts. Remove grommet and pull capillary
c. Adjustment. Before system is charged, ad-
tubes through partition.
just louver push-pull control as follows:
5-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business