|
|
TM 5-4120-356-14
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
S e c t i o n I. Repair Parts, Special Tools, TMDE, and Support Equipment
3-1.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organiza-
t i o n a l and Equipment (MTOE) applicable to your unit.
3-2.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
There are no special tools, TMDE, or support equipment r e q u i r e d to perfom Organiza-
tional Maintenance on the air conditioner.
3-3. REPAIR PARTS
R_Lp a i r p a r t s a r e l i s t e d a n d i l l u s t r a t e d i n t h e R e p a i r P a r t s a n d S p e c i a l T o o l s L i s t
e
T M 5-4120-356-24P covering Organizational Maintenance of this equipment.
Section II. Service Upon Receipt
ASSEMBLY AND PREPARATION FOR USE
3-4.
a.
Unpacking.
(1) Move the air conditioner to t h e i n s t a l l a t i o n site before removing
s h i p p i n g c o n t a i n e r . Cut the metal bands and r e m o v e top, end, a n d s i d e s o f c a r t o n ,
a n d the inner covering. R e m o v e bolts securing base of unit to carton, and using
t h e handles, lift unit from carton.
( 2 ) Inspect the equipment for damage incurred during shipment. If the
equipment has been damaged, report the damage on DD form 6, Packaging Improvement
Report.
( 3 ) Check the equipment against the packing slip to see if the ship-
m e n t is complete. R e p o r t all discrepancies in accordance with the instructions of
TM 38-750.
(4) Check to see if the equipment has been modified.
(5) Prior to placing the unit in operation, accomplish depreservation
i n a c c o r d a n c e with the instructions outlined in DA Form 2258 (Depreservation Guide
o f Engineer Equipment). D A Form 2258 is attached to or near the operational controls.
b . Assembly.
There are no assembly procedures. However, the air conditioner
should be inspected after receipt as follows:
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |