Click here to make tpub.com your Home Page

Page Title: Chapter 3. ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-356-14
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
S e c t i o n I. Repair Parts, Special Tools, TMDE, and Support Equipment
3-1.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organiza-
t i o n a l and Equipment (MTOE) applicable to your unit.
3-2.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
There are no special tools, TMDE, or support equipment r e q u i r e d to perfom Organiza-
tional Maintenance on the air conditioner.
3-3. REPAIR PARTS
R_Lp a i r p a r t s a r e l i s t e d a n d i l l u s t r a t e d i n t h e R e p a i r P a r t s a n d S p e c i a l T o o l s L i s t
e
T M 5-4120-356-24P covering Organizational Maintenance of this equipment.
Section II. Service Upon Receipt
ASSEMBLY AND PREPARATION FOR USE
3-4.
a.
Unpacking.
(1) Move the air conditioner to t h e i n s t a l l a t i o n site before removing
s h i p p i n g  c o n t a i n e r .  Cut the metal bands and r e m o v e top, end, a n d s i d e s o f c a r t o n ,
a n d the inner covering.  R e m o v e bolts securing base of unit to carton, and using
t h e handles, lift unit from carton.
( 2 ) Inspect the equipment for damage incurred during shipment. If the
equipment has been damaged, report the damage on DD form 6, Packaging Improvement
Report.
( 3 ) Check the equipment against the packing slip to see if the ship-
m e n t is complete.  R e p o r t all discrepancies in accordance with the instructions of
TM 38-750.
(4) Check to see if the equipment has been modified.
(5) Prior to placing the unit in operation, accomplish depreservation
i n a c c o r d a n c e with the instructions outlined in DA Form 2258 (Depreservation Guide
o f Engineer Equipment).  D A Form 2258 is attached to or near the operational controls.
b .  Assembly.
There are no assembly procedures. However, the air conditioner
should be inspected after receipt as follows:

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business