Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Starting and Operating Instructions
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  5-4120-361-14 (3) Connect the MS3106R-24-22S power input  connector  plug  furnished  with  the  air  condi- tioner  to  a  suitable  electrical  power  cable.  Connect the cable to the proper electrical power source and install the plug end of cable to either the main  power  receptacle  or  the  alternate  power receptacle. If  alternate  power  receptacle  J12  is used,  refer  to  wiring  diagram  (figure  1-5)  and change wire lead connection at TB1. CAUTION To avoid damage to the compressor electrical input power must be applied to  energize  the  compressor  crankcase heater at least 4 hours before opera- ting unit in the cool mode. For pro- longed periods of storage, long shut down  periods  or  lengthly  exposure (14 days or more) to sub-zero temp- eratures,    the  preheater  should  be energized  for  twelve  (12  hrs)  prior to operation of the air conditioning unit in the cool mode. 2-10.  Starting  and  Operating  Instructions. a. Preparation  for  Starting. (1)   Perform   the   daily   preventive maintenance  service  (para  2-4). (2) Connect the main power cable. (3) Check drain holes to insure that they  were  open. (4) Be sure the unit is firmly secured. (5) Roll up condenser cover and tie at top of air conditioner to clear condenser opening. NOTE When vent damper door is open to admit fresh air, partially close evapor- ator  inlet,  louver  to  balance  incoming air. Keep  vent  or  damper  door closed  during  heavy  rain. b.  Starting  Instructions  for  Cooling. Start  the  air  conditioner  for  cooling  as  shown in  figure  2-5. c.  Operating  Instructions  for  Cooling. Operate the air conditioner for cooling as shown by figure 2-6. Figure 2-4. Ground wire installation. 2-8 Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business