Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Testing
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4120-361-14 (ii) Refer to figure 4-10 and install the junction box. (6) Condenser Fan Motor High Speed Relay. (a) Testing. Check for loose connections and cracked or broken cas- ing. Check for continuity with a multi- meter. If no continuity exists or if the casing is cracked or broken, replace the relay. (b) Removal. (i) Refer to figure 4-10 and remove the junction box. (ii) Refer to figure 4-16 and remove the condenser high speed relay. (c)  Installation. install install Relay. connect (i) Refer to figure 4-16 and the condenser high speed relay. (ii) Refer to figure 4-10 and the  junction  box. (7) Condenser Fan Motor Low Speed (a)  Testing. Check for loose ions and cracked or broken cas- ing. Check for continuity with a multi- meter. If no continuity exists, or if the casing is cracked or broken, replace the relay. (b) Removal. (i) Refer to figure 4-10 and remove the junction box. (ii) Refer to figure 4-16 and remove the condenser low speed relay. (c)  Installation. (i) Refer to figure 4-16 and install the condenser low speed relay. (ii) Refer to figure 4-10 and install the junction box. (8)  Compressor  Relay. (a) Testing. Check for loose connections and cracked or broken cas- ing. Check for continuity with a multi- meter. If no continuity exists or if the casing is cracked or broken, replace the relay. (b) Removal. (i) Refer to figure 4-10 and remove the junction box. (ii) Refer to figure 4-16 and remove the compressor relay. (c)  Installation. (i) Refer to figure 4-16 and install the compressor relay. (ii) Refer to figure 4-10 and install the junction box. (9)  Terminal  Boards. (a) Testing. Check for loose connections, loose mounting or cracked or broken casing; replace if defective. (b) Removal. (i) Refer to figure 4-10 and remove the junction box. (ii) Refer to figure 4-16 and remove the terminal boards. (c)  Installation. (i) Refer to figure 4-16 and install the terminal boards. (ii) Refer to figure 4-10 and install the junction box. 4-28. Transformer and Resistor. a. Removal. (1) Refer to figure 4-10 and re- move the junction box. (2) Refer to figure 4-17 and re- move the transformer and resistor. Re- move resistor from transformer if either is faulty when tested as follows: b. Testing. (1) Refer to wiring diagram (fig- ure 1-5) and use a multimeter to test the transformer for continuity through both the primary winding and the secon- dary  winding. If no continuity exists through either winding, replace the transformer. 4-26

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business