Click here to make tpub.com your Home Page

Page Title: Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-369-14
Section II. MAINTENANCE ALLOCATION CHARGE (Continued)
(6)
(5)
(4)
(3)
(2)
(1)
Remarks
Tools and
Maintenance Level
Maintenance
Component/Assembly
Group
Equipment
HD
C
O
F
Function
Number
0.2
Inspect
Information Plates
0.5
Replace
0.5
Inspect
Insulation
2.0
Replace
Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS
(5)
(4)
(3)
(2)
(1)
Tool Number
National/NATO
Nomenclature
Maintenance
Reference
Stock Number
Level
Code
No special tools
& test equipment
required. Standard
tools and test equip-
ment contained in
the following tool
kits are adequate to
accomplish the main-
tenance functions
listed in Section II:
5180-00-597-1474
Tool Kit, Service,
Refrigeration Unit
(SC 5180-90-CL-N18)
Soldering Gun Kit
Vacuum Pump
(07295)
4130-01-338-2707
Recovery and Recycling
17500B
Unit, Refrigerant
Section IV. MAINTENANCE ALLOCATION CHART
REFERENCE
REMARKS
CODE
No supplemental instructions or explanatory remarks for a particular maintenance
function listed in Section II are required. All functions are sufficiently defined in
Section 1. Due to various methods of installing the air conditioner, all active time listed
for maintenance tasks are with the air conditioner in the off-equipment position at
organizational user level or in a repair shop facility.
Replace gasket, fasteners, insulation and information plates
A
Replace component parts
B
Adjust louver linkage only
C
Change 2
C-7/(C-8 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business