|
|
TM 5-4120-374-13
4-19. FAN MOTOR
This task covers:
c. Test
a. Removal
d. Installation
b. Inspection
INITIAL SETUP
T r o u b l e s h o o t i n g Reference
Material/Parts
FANS, Malfunction 1, Step 2
Right Side Panel Screws (17)
COMPRESSOR, Malfunction 2, Step 1
Top Center Panel Screws (10)
AlR OUTPUT, Malfunction 1, Step 4
Return Air Grill Screws (8)
AlR OUTPUT, Malfunction 2, Step 4
Air Diffuser Grill Screws (8)
Control Panel Plate Screws (2)
NOISE, Malfunction 1, Step 3
Front Panel Screws (14)
Blower Intake Ring Screws (7)
Approximate Time Required (in minutes)
30
Removal
Fan Motor Capscrews (4)
15
Fan Motor Self-Locking Nuts (4)
Inspection and Testing
15
Thermostat Switch Screws (2)
Repair
30
Installation
References
90
TOTAL TIME
None
REMARKS
LOCATION/lTEM
ACTION
RIGHT SIDE AND TOP OF HOUSING
a. Remove seventeen (17) screws securing right side panel.
1. Right Side Panel
b. Remove right side panel.
2 . Top Center Panel
a. Remove seventeen (17) screws securing right side panel.
b.
Remove
right
side
panel.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |