|
|
TM 5-4120-374-13
4-27. START RELAY (CONT)
ACTION
REMARKS
LOCATION/lTEM
TOP OF HOUSING
a. Remove two (2) screws securing cover to compressor.
3. Compressor Cover
b. Remove cover.
4. Start Relay
a. Tag and disconnect electrical leads from start relay.
b. Remove two (2) screws securing start relay to compressor.
c. Remove start relay.
a. Tag and disconnect electrical leads from start relay.
5. Start Relay
b. Using an ohmmeter, measure continuity across start relay
terminals.
c. Replace start relay if there is NO continuity.
6. Start Relay
a. Connect electrical leads to start relay and remove tags.
b. Align holes in start relay with holes in compressor.
c . Secure start relay with two (2) screws.
d . Replace compressor cover and secure with two (2) screws.
7. Top Rear Panel
a. Align holes in top rear panel and housing.
b. Secure top rear panel with nine (9) screws.
a. Align holes in left side panel with holes in frame.
8. Left Side Panel
b. Secure left side panel with seventeen (17) screws.
4-56
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |