|
|
TM 5-4120-374-13
5-10. EVAPORATOR COIL
This task covers:
a. Removal
d. Installation
b. Test
INITIAL SETUP
References
Material/Parts
Top Center Panel Screws (10)
Top Front Panel Screws (7)
Troubleshooting Reference
Top Rear Panel Screws (9)
None
Right Side Panel Screws (17)
Rear Panel Screws (14)
Approximate Time Required (in minutes)
Left Side Panel Screws (17)
30
Removal
Thermostat Switch Screws (2)
20
Test
Selector Switch Screws (2)
20
Repair
Control Panel Plate Screws (2)
720
Installation
Front Panel Screws (14)
790
TOTAL TIME
Condenser Shroud Screws (2)
Frame Screws (8)
Evaporator Coil Screws (6)
Evaporator Coil Screws (4)
REMARKS
ACTION
LOCATION/lTEM
TOP AND LEFT SIDE OF HOUSING
Remove ten (10) screws securing top center panel.
1. Top Center Panel a.
Remove top center panel.
b.
Remove seven (7) screws securing top front panel.
2. Top Front Panel a.
b.
Remove top front panel.
a.
Remove nine (9) screws securing top rear panel.
3. Top Rear Panel
Remove top rear panel.
b.
4. Left Side Panel
Remove seventeen (17) screws securing left side panel.
a.
b.
Remove left side panel.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |