|
|
TM 5-4120-374-13
5-14. EXPANSION VALVE
This task covers:
c. Installation
a. Removal
b. Test
INITIAL SETUP
Troubleshooting Reference
Material/Parts
AIR CONDITIONER, Malfunction 3, Step 4
Top Center Panel Screws (10)
AIR CONDITIONER, MaIfunction 4, Step 1
Top Front Panel Screws (7)
AIR CONDITIONER, Malfunction 5, Step 3
Right Side Panel Screws (17)
Approximate Time Required (in minutes)
Insulation Tape, App. E, Item 6
10
Removal
10
Test
References
Installation
730
750
TOTAL TIME
REMARKS
ACTION
LOCATION/lTEM
TOP AND RIGHT SIDE OF HOUSING
1. Top Center Panel a. Remove ten (10) screws securing top center panel.
b. Remove top center panel.
2. Top Front Panel a. Remove seven (7) screws securing top front panel.
b. Remove top front panel.
3. Right Side PaneI
a. Remove seventeen (17) screws securing right side panel.
b. Remove right side panel.
4. Return Air Grill
a. Loosen setscrew and remove return air control knob.
b . Remove eight (8) screws securing return air grill to front
panel.
c . Partially remove return air grill.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |