Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-376-14 4-24.  HEATER,  TRANSFORMER,  RECTIFIER  AND  RELATED  PARTS/Inspect,  Test,  Replace (Cont) LOCATION/ITEM Installation: 6.   Slide   thermostat   sensor   bulb   (10)   thru   junction   box   (14)   to   left   evaporator   fan   housing   (11). 7.  Secure  thermostat  sensor  bulb  to  left  evaporator  fan  housing  with  two  clamps  (9)  two  lock washers  (8)  and  two  screws  (7). 8.  Slide  control  module  (13)  into  junction  box. 9.  Secure  control  module  to  junction  box  with  knob  (12). 10.   Align   front   louver   (evaporator   inlet)   (6)   with   holes   in   housing   and   secure   with   ten   screws (4)  and  ten  lock  washers  (5). 11.   Align   front   cover   (2)   with   holes   in   center   cover   (3)   and   housing   and   secure   with   fourteen screws   (1). Removal: Capacitor  (C-1)  and  (C-2) Unsolder   leads   from   capacitor   in   accordance   with   Appendix   E   and   tag   wires. 4-150

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business