| |
TM5-4120-376-14
5-19. REFRIGERANT VALVES AND RELATED TUBING/Test, Repair, Replace (Cont)
LOCATION/ITEM
Installation:
13. Braze valve (quench) in accordance with paragraph 5-10, page 5-12.
14. Align one clamp (11) quench valve (13) spacer post (12) with hole in bulkhead and secure
thermal expansion valve and spacer post to bulkhead with one screw (10).
15. Insert approximately one ounce of thermal mastic (Table D-1, Item 20) in bulb well.
16. Move thermal expansion valve sensor bulb (15) back and forth to distribute thermal
mastic (Table D-1, Item 20) equally.
17. Set bulb (15) one inch beyond open end.
18. Test, evacuate and charge system in accordance with paragraphs 5-8 through 5-14, pages
5-10 through 5-19.
5-42
|