| |
TM5-4120-376-14
5-21. CHARGING VALVES, PRESSURE SWITCHES, LIQUID RECEIVE R, SIGHT INDICATOR,
PRESSURE RELIEF VALVES/Replace (Cont)
L O C A T I O N / I T E M
RECEIVER
Installation:
CAUTION
Maintain a 1-2 cpm (0.1-0.2 M 3/Min) flow of dry nitrogen through the
refrigeration system to prevent oxidation and scaling when brazing or debrazing
components.
1. Braze in accordance with paragraph 5-10, pages 5-12 and 5-13.
2. Align receiver (12) and one clamp (11) with holes in bulkhead and secure to bulkhead with
two screws (9) and two lock washers (10).
5-57
|