Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SIGHT INDICATOR.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-376-14 5-21.  CHARGING  VALVES,  PRESSURE  SWITCHES,  LIQUID  RECEIVER,  SIGHT  INDICATOR, PRESSURE RELIEF VALVES/Replace (Cont) LOCATION/ITEM SIGHT  INDICATOR Installation: CAUTION Maintain  a  1-2  cpm  (0.1-0.2  M3  Min)  flow  of  dry  nitrogen  through  the refrigeration  system  to  prevent  oxidation  and  scaling  when  brazing  or  debrazing components. 1.  Braze  in  accordance  with  paragraph  5-10,  page  5-12  and  5-13. 2.  Align  sight  indicator  (6)  and  one  clamp  (5)  with  holes  in  housing and  two  lock  washers  (4). HIGH  PRESSURE  SWITCHES and  secure  two  screws  (3) CAUTION Assure   sampling   tubing   is   reinstalled   in   proper   location   to   prevent   damaging. 3.  Attach  wires  to  appropriate  terminals  in  accordance  with  Appendix  E  and  remove  tags. 4.   Connect   sampling   tubing   flare   nut   (6)   and   tighten. 5.  Align  pressure  switches  (5)  with  charging  valve  box  (1)  and  secure  with  two  screws  (4). 6.  Align  charging  valve  box  (5)  with  housing  and  secure  charging  valve  box  to  housing  with four  screws  (3). 5-58

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business