| |
TM5-4120-376-14
5-21. CHARGING VALVES, PRESSURE SWITCHES, LIQUID RECEIVER, SIGHT INDICATOR,
PRESSURE RELIEF VALVES/Replace (Cont)
LOCATION/ITEM
Installation:
7.
8.
9.
10.
11.
12.
5-10
13.
Align suction charging valve (4) with charging valve box and secure with two screws (8).
Align discharge charging valve (6) with charging valve box and secure with two screws (9).
Align charging valve box with housing and secure with four screws (7).
Connect one flare nut (3) to suction charging valve (4).
Connect one flare nut (5) to discharge charging valve (6).
Test, evacuate and charge system in accordance with paragraphs 5-8 through 5-14, pages
through 5-19.
Align access cover (2) with holes in housing and secure eight screws (1).
5-59
|