Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 5-25. Pressure Regulating Valve
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-4120-377-14 Figure  5-25.  Pressure  Regulating  Valve (1)  Discharge  the  refrigeration  system  in  accordance  with  paragraph  5-6. (2)  Purge  the  system  with  nitrogen  and  debraze  the  tube  connections.  (See  para  5-7  and  5-8.) (3)  Remove  the  pressure  regulating  valve. c.    Installation (1)  Place  the  pressure  regulating  valve  on  the  tube  ends,  purge  the  system  with  nitrogen  and  braze  the tube joints. (See para 5-7 and 5-8.) (2) Replace the dehydrator. (See para 5-13.) (3)   Install   the   compressor.   (See   para   5-20.) (4)   Leak   test   all   newly   connected   joints   and   those   in   the   repair   area.   (See   para   5-9.) (5) Evacuate and charge the refrigerant system. (See para 5-10 and 5-11.) 5-52

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business