5-25.
TM5-4120-377-14
a. Inspection
Preliminary procedure: Remove junction
(1) Check
5-9.
(2) Check
b. Removal
for general condition and
Figure 5-26. Receiver
box. (See para 4-46.)
signs of leakage. If leakage is suspected, leak test per paragraph
that mounting hardware is secure.
Preliminary procedure: Remove compressor. (See para 5-20.)
Discharge the refrigeration system in accordance with paragraph 5-6.
Using screwdriver, remove two screws and lock washers from receiver bracket.
Remove receiver bracket.
Purge the system with nitrogen and debraze the tube connections. (See para 5-7 and 5-8.)
Remove the receiver.
c. Installation
(1) Place the receiver on the tube ends, purge the system with nitrogen, and braze the tube joints. (See
para 5-7 and 5-8.)
(2) Using a screwdriver, secure the receiver bracket to the casing side panel with two screws and lock
washers.
5-53
|