TM5-4120-383-14
4-3.
SERVICE UPON RECEIPT OF MATERIAL.Continued
NOTE
The shipping container is of such a design that it
may be retained for reuse for mobility purposes if
frequent relocation of the air conditioner is
anticipated.
(2) Remove Shipping Container. Cut the metal bands that hold
Lift the container
the top and sides of the container to the base.
vertically and remove it from the base and cabinet.
(3) Remove Packaging. Remove the cushioning around the top
of the cabinet and retain, if reuse is anticipated. Remove the
preservation barrier by tearing around the bottom of the cabinet.
Remove the technical publications envelope and accessory sack that
are taped to the cabinet and put them in a safe place.
NOTE
It is recommended that the cabinet be left bolted to
the shipping pallet until time to place it in the
installation position. All receiving inspection
actions can be conducted without removal from the
pallet.
Receiving Inspection.
Perform receiving inspection of the
c.
air conditioner in the following manner:
(1) Inspect the equipment for damage incurred during
If the equipment has been damaged, report damage on DD
shipment.
Form 6, Packaging Improvement Report.
(2) Check the equipment against the packing slip to see if
the shipment is complete. Report all discrepancies in accordance
with the instructions of DA Pamphlet 738-750 (The Army Maintenance
Management System).
(3) Check to see whether the equipment has been modified.
NOTE
The unit weight (less shipping pallet) is 185 pounds
(83.9 kg). When lifting or moving the unit on the
shipping pallet, a forklift may be used. When
lifting the unit into position use four people, one
at each lifting handle.