TM5-4120-383-14
4-3.
SERVICE UPON RECEIPT OF MATERIAL.-Continued
(4) Remove Pallet. Tilt the unit and pallet or raise the
unit using a forklift. Remove the four bolts from the bottom of
the pallet. Using 4 people (one at each lifting handle), carefully
lift the unit from the shipping pallet.
INSTALLATION INSTRUCTIONS.
Air Conditioner Preparation For Installation.
a.
(1) Two input power connectors are provided on the air
(See fig. 4-1.) Connector J1 is located on the front
conditioner.
of the air conditioner above the control panel module. Connector
J11 is located on the rear of the air conditioner in the upper left
Determine which connector best suits your installation.
corner.
If power
If power source is inside of conditioned area use J1.
source is outside of conditioned area use J11.
(a) Air conditioners are shipped from the factory wired for
If this connector is used no
the use of the J1 power connector.
(See fig. 4-2.)
change is necessary.
(b) If the J11 connector is to be used leads TB1.1-TB3.1,
TB1.2-TB3.2, and TB1.3-TB3.3 on terminal board TB3 must be moved
from terminals 1, 2, and 3 to terminals 4, 5, and 6 respectively.
Proceed as follows:
1 Remove top front (evaporator section) cover from air
conditioner.
2 Disconnect wire TB1.1-TB3.1 from TB3 terminal 1 and
reconnect to terminal 4.
3 Disconnect wire TB1.2-TB3.2 from TB3 terminal 2 and
reconnect to terminal 5.
4 Disconnect wire TB1.3-TB3.3 from TB3 terminal 3 and
reconnect to terminal 6.
5 Install top front (evaporator section) cover.
4-9
|