Click here to make tpub.com your Home Page

Page Title: Table 4-1. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-383-14
Table 4-1.
ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)
QUARTERLY SCHEDULE-Continued
Para
Item to be
Item
No.
Ref.
Procedures
Inspected/Serviced
16
4-10
a. Roll down cover and inspect
Fabric Cover
for tears, cracks, or any
other sign of damage or
b. If washing is necessary, use
fresh water with a small amount
of mild detergent.
c. Reroll and secure cover in
the stowed position. If
cover was washed, be sure it
is thoroughly dry before
rerolling.
2-6
17
Do not check operation
Operational
in COOL mode until after
Checks
input power has been
reconnected for a
sufficient time to
eliminate any danger of
liquid refrigerant accum-
ulation in the compressor
Under moderate
cylinder.
conditional if input power
has been disconnected, a
four hour warm-up period
If the
should be allowed.
air conditioner has been
exposed to below freezing
temperatures without input
power, an eight hour warm up
period is recommended.
a. Be sure MODE SELECTOR switch
is in the OFF position and
reconnect input power.
4-27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business