Click here to make tpub.com your Home Page

Page Title: PURGING THE REFRIGERANT SYSTEM.-Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-383-14
512.
PURGING THE REFRIGERANT SYSTEM.-Continued
Allow nitrogen to flow through the system at the rate of 1 -
j.
2 cfm (0.028 - 0.057 m3/minute) for a minimum of 5 minutes before
starting any brazing operation, then allow it to continue to flow
at the same rate until all brazing operations are completed.
After installation brazing operations are completed, allow
k.
nitrogen to flow for a minimum of 5 minutes.
Close nitrogen cylinder valve, nitrogen regulator, charging
l.
manifold valve, and both high and low pressure charging valves on
the unit.
Disconnect hose from nitrogen tank.
m.
n.
Assuming that all repairs are completed, go to paragraph
Nitrogen Tank Connection

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business