|
|
TM5-4120-383-14
5-32.
COMPRESSOR.-Continued
Energize the bypass solenoid valve by applying 24
volts dc across pins A and B of plug P8.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
Switch the pump lines so that the discharge line is
connected to the valve at point 3 and the recovery
line is connected to the tubing at point 1.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
Close the suction line service valve and move the
discharge line from the valve at point 3 to the
tubing at point 2.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
De-energize the bypass solenoid valve by
disconnecting the dc voltage source from pins A and
B of plug P8.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
Uncap the tubing at points 4 and 5.
Disconnect the pump discharge line from the tubing
at point 2 and connect it to the tubing at point 5.
Disconnect the recovery line from the tubing at
point 1 and connect it to the tubing at point 4.
Cap the tubing at points 1 and 2.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
Move the pump discharge line from the tubing at
point 5 to the valve at point 6. Cap the tubing at
point 5.
Open the discharge line service valve.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
5-79
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |