5-32.
COMPRESSOR.-Continued
Switch the pump lines so that the discharge line is
connected to the tubing at point 4 and the recovery
line is connected to the valve at point 6.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
Remove the cap
from the tubing at point 2.
Disconnect the
pump discharge line from the tubing
at point 4 and
connect it to the tubing at point 2.
Cap the tubing
at point 4.
Disconnect the pressure equalizer solenoid valve
plug P9 from receptacle J9.
Energize the pressure equalizer solenoid valve by
applying 24 volts dc across pins A and B of plug P9.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
Remove the cap from the tubing at point 5.
Remove the pump discharge line from the tubing at
point 2 and connect it the tubing at point 5.
Remove the recovery line from the valve at point 6
Close the
and connect it to the tubing at point 2.
valve at point 6.
Start the pump and flush the line for approximately
10 minutes, then turn the pump off.
De-energize the pressure equalizer solenoid valve by
removing the voltage source from pins A and B of
plug P9.
Disconnect the discharge and recovery lines from the
tubing and remove all caps from the tubing.
at approximately 30 psig (2.11 kg/cm ) as follows:
Make sure caps are off the tubing at all points and
q
that the suction and discharge line service valves
are open.