Click here to make tpub.com your Home Page

Page Title: COMPRESSOR.-Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-383-14
5-32.
COMPRESSOR.-Continued
Remove the nitrogen line from the tubing at point 4
and connect it to the valve at point 6.  Release
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
Remove the nitrogen line from the valve at point 6
and connect it to the valve at point 3.  Release
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
Remove the nitrogen line from the valve at point 3.
Close the suction line and discharge line service
valves.
Cap all open tubing until installation of new
components.
Replace dehydrator (para 5-30).
Reconnect plugs P8 and P9 to receptacles J8 and J9
respectively.
c.
Installation.
The compressor is supplied with a complete charge of
oil.  Take care that oil is not lost when handling
and installing compressor.
(1) Install eight rubber mounting washers in mounting
holes of air conditioner housing and compressor mounting feet.
NOTE
If any refrigeration piping was disconnected with the
compressor removal, transfer the piping to the
replacement compressor before installing it in the
air conditioner.
(2) Carefully set compressor down into unit and install four
flat washers and cap screws.
(3) Tip unit up slightly and install four flat washers and
lock nuts from bottom.
(4) Tighten all four sets of mounting hardware.
5-82

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business