Click here to make tpub.com your Home Page

Page Title: Table 4-1. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-384-14
Table
4-1.
ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)
QUARTERLY SCHEDULE-Continued
Para
Item to be
Item
Ref.
Inspected/Serviced
Procedures
No.
16
Roll  down  cover  and  inspect
4-10
Fabric
Cover
a.
for  tears,  cracks,  or  any
other  sign  of  damage  or
b.
If  washing  is  necessary  use
fresh  water  with  a  small
amount  of  mild  detergent.
Reroll  and  secure  cover  in
c.
the  stowed  position.  If
cover  was  washed,  be  sure  it
is  thoroughly  dry  before
rerolling.
2-6
Operational
Checks
Do  not  check  operation
17
in COOL mode until after
input  power  has  been
reconnected  for  a
sufficient  time  to
eliminate  any  danger  of
liquid  refrigerant  accum-
ulation  in  the  compressor
Under  moderate
cylinder.
conditions,  if  input  power
has  been  disconnected,
a four hour warm-up period
If  the
should  be  allowed.
air  conditioner  has  been
exposed  to  below  freezing
temperatures  without  input
power,  an  eight  hour  warm-up
period  is  necessary.
a.
is  in  the  OFF  position  and
reconnect  input  power.
4-27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business