| |
- OPERATOR'S, ORGANIZATIONAL,
DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL
- AIR CONDITIONER, HORIZONTAL
COMPACT
- By Order of the Secretary of
the Army:
- AIR CONDITIONER, HORIZONTAL
COMPACT,
- By Order of the Secretary of
the Army:
- AIR CONDITIONER, HORIZONTAL
COMPACT,
- AIR CONDITIONER, HORIZONTAL
COMPACT,
- AIR CONDITIONER, HORIZONTAL
COMPACT,
- By Order of the Secretary of
the Army:
- AIR CONDITIONER, HORIZONTAL,
COMPACT,
- By Order of the Secretary of
the Army:
- Warning
- Warning (Cont)
- Warning (Cont)
- TABLE OF CONTENTS
- TABLE OF CONTENTS - Continued
- LIST OF ILLUSTRATIONS
- LIST OF ILLUSTRATIONS (Cont)
- LIST OF TABLES
- Figure 1-1. Air Conditioner
- Chapter 1. INTRODUCTION
- REPORTING EQUIPMENT
IMPROVEMENT RECOMMENDATIONS (EIR8).
- LOCATION AND DESCRIPTION OF
MAJOR COMPONENTS.
- Figure 1-2. Location of Major
Components (Sheet 1 of 2)
- Figure 1-2. Location of Major
Components (Sheet 2 of 2)
- LOCATION AND DESCRIPTION OF
MAJOR COMPONENTS.-Continued
- LOCATION AND DESCRIPTION OF
MAJOR COMPONENTS.-Continued
- LOCATION AND DESCRIPTION OF
MAJOR COMPONENTS.-Continued
- DIFFERENCES BETWEEN MODELS
- Figure 1-2.1 Electromagnetic
Pulse (EMP) Kit Parts
- EQUIPMENT DATA
- Figure 1-3. Refrigeration
Schematic
- REFRIGERATION CYCLE.
- REFRIGERATION
CYCLE.-Continued
- Chapter 2. OPERATING
INSTRUCTIONS
- OPERATOR'S CONTROLS.
- Figure 2-1. Operator's
Controls and Indicators
- Figure 2-2. Operator's
Controls and Indicators
- INDICATORS.
- Section II: PREVENTIVE
MAINTENANCE CHECKS AND SERVICES (PMCS)
- Table 2-1. OPERATOR
PREVENTIVE MAINTENANCE CHECKS AND SERVICES
- Table 2-1. OPERATOR
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (Cont)
- Section III OPERATION UNDER
USUAL CONDITIONS.
- OPERATIONAL CHECKS.
- OPERATIONAL CHECKS.-Continued
- GENERAL OPERATING PROCEDURES.
- Table 2-2 INITIAL OPERATOR
CONTROL SETTINGS
- INFORMATION PLATES.
- PREPARATION FOR MOVEMENT.
- OPERATION IN EXTREME COLD.
- OPERATION IN DUSTY OR SANDY
CONDITIONS
- OPERATION IN SALT AIR OR SEA
SPRAY.
- Chapter 3. OPERATOR'S
MAINTENANCE INSTRUCTIONS
- Table 3-1. OPERATOR
TROUBLESHOOTING
- REDUCED HEATING CAPACITY.
- TOO MUCH HEAT.
- Chapter 4: ORGANIZATIONAL
MAINTENANCE INSTRUCTIONS
- Section I. REPAIR PARTS,
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
- Section II: SERVICE UPON
RECEIPT OF EQUIPMENT
- Figure 4-1. Installation
Dimensions (Sheet 1 of 6)
- Figure 4-1. Installation
Dimensions (Sheet 2 of 6)
- Figure 4-1. Installation
Dimensions (Sheet 3 of 6)
- Figure 4-1. Installation
Dimensions (Sheet 4 of 6)
- Figure 4-1. Installation
Dimensions (Sheet 5 of 6)
- Figure 4-1. Installation
Dimensions (Sheet 6 of 6)
- SERVICE UPON RECEIPT OF
MATERIAL.
- SERVICE UPON RECEIPT OF
MATERIAL. (cont)
- INSTALLATION INSTRUCTIONS.
- Figure 4-2. Wiring Connection
Changes for J1/J11 Power Input Connector
- INSTALLATION
INSTRUCTIONS.-Continued
- INSTALLATION
INSTRUCTIONS.-Continued
- Figure 4-4. Wiring Diagram
(Sheet 1 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 2 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 3 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 4 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 5 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 6 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 7 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 8 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 9 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 10 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 11 of 12)
- Figure 4-4. Wiring Diagram
(Sheet 12 of 12)
- Figure 4-4.1 . Air
Conditioner Schematic
- INSTALLATION
INSTRUCTIONS.-Continued
- INSTALLATION
INSTRUCTIONS.-Continued
- PRELIMINARY SERVICING AND
ADJUSTMENT OF EQUIPMENT.
- Section III: PREVENTIVE
MAINTENANCE CHECKS AND SERVICES (PMCS)
- Figure 4-6. Location of PMCS
Items
- Table 4-1. ORGANIZATIONAL
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE
- Table 4-1. ORGANIZATIONAL
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE
(Cont)
- Table 4-1. ORGANIZATIONAL
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE
(Cont)
- Table 4-1. ORGANIZATIONAL
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE
(Cont)
- Table 4-1. ORGANIZATIONAL
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE
(Cont)
- Table 4-1. ORGANIZATIONAL
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE
(Cont)
- Table 4-1. ORGANIZATIONAL
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) QUARTERLY SCHEDULE
(Cont)
- Table 4-2. TROUBLESHOOTING
- CONDITIONED (EVAPORATOR) AIR
FAN DOES NOT START OR STOPS DURING OPERATION IN ANY MODE.
- CONDENSER FAN FAILS TO
OPERATE.
- INSUFFICIENT COOLING.
- COMPRESSOR WILL NOT START.
- COMPRESSOR STARTS, BUT GOES
OUT ON OVERLOAD.
- CONDENSER AIR OUTLET VOLUME
LOW.
- EXCESSIVE NOISE .
- Section V MAINTENANCE
PROCEDURES
- FABRIC COVER
- TOP COVERS.
- TOP COVERS. - Continued
- TOP COVERS. - Continued
- Figure 4-9. Rear Screens
- SCREENS AND GUARDS.
- RETURN AIR LOUVER AND AIR
FILTER.
- Figure 4-10. Return Air
Louver and Air Filter
- RETURN AIR LOUVER AND AIR
FILTER.-Continued
- SUPPLY AIR LOUVER-
- SUPPLY AIR LOUVER.-Continued
- MIST ELIMINATOR.
- MIST ELIMINATOR. - Continued
- CONDENSER AIR DISCHARGE
LOUVER AND LINKAGE.
- Figure 4-13. Condenser Air
Discharge Louver and Linkage
- CONDENSER AIRE DISCHARGE
LOUVER AND LINKAGE. - Continued
- CONDENSER AIRE DISCHARGE
LOUVER AND LINKAGE. - Continued
- FRESH AIR DAMPER AND
ACTUATOR.
- FRESH AIR DAMPER AND
ACTUATOR. - Continued
- FRESH AIR DAMPER AND
ACTUATOR. - Continued
- CONDENSATE DRAIN.
- Figure 4-15. Condensate Drain
Lines
- ELECTRICAL WIRING REPAIR -
GENERAL .
- Table 4-3. WIRE LIST
- Table 4-3. WIRE LIST (cont)
- Table 4-3. WIRE LIST (cont)
- Table 4-3. WIRE LIST (cont)
- CONTROL MODULE.
- CONTROL MODULE. - Continued
- Figure 4-17. Control Module
- TEMPERATURE SELECTOR (CONTROL
SWITCH THERMOSTAT) S3.
- Figure 4-18. TEMPERATURE
SELECTOR (Control Switch Thermostat) S3
- MODE SELECTOR SWITCH S1.
- Figure 4-19. MODE SELECTOR
Switch S1
- MODE SELECTOR SWITCH S1. -
Continued
- MODE SELECTOR SWITCH S1. -
Continued
- Figure 4-20. COMPR CIRCUIT
BKR (Compressor Circuit Breaker) CB1
- COMPR CIRCUIT BKR CB1
- CONTROL MODULE WIRING
HARNESS.
- CONTROL MODULE WIRING
HARNESS. - Continued
- JUNCTION BOX.
- Figure 4-22. Junction Box
- JUNCTION BOX WIRING HARNESS.
- JUNCTION BOX WIRING HARNESS.
- Continued
- RELAY.
- RELAY. (cont)
- RELAY. (cont)
- CONTROL CIRCUIT BREAKER CB2.
- CONTROL CIRCUIT BREAKER CB2.
- Continued
- MISCELLANEOUS CABLES,
HARNESSES, AND TERMINAL BOARDS.
- Figure 4-26. Miscellaneous
Cables, Harnesses, Terminal Boards
- TRANSFORMER, RECTIFIER,
CAPACITORS, MD HARNESS.
- Figure 4-27. Transformer and
Rectifier
- TRANSFORMER, RECTIFIER,
CAPACITORS, AND
- TRANSFORMER, RECTIFIER,
COMPACTORS, AND HARNESS
- TRANSFORMER, RECTIFIER,
CAPACITORS, AND HARNESS.-Continued
- Figure 4-27.1 Capacitors and
Relay, Model F18H-1S only
- 4-31.1. (MODEL F18H-1S ONLY)
CAPACITORS - CONDENSER RUN (C-2), EVAPORATOR RUN (C-3), COMPRESSOR
START (C4), COMPRESSOR RUN (C-5) AND RELAY; COMPRRSSOR START (KS).
- 4-31.1. (MODEL F18H-1S ONLY)
CAPACITORS - CONDENSER RUN (C-2), EVAPORATOR RUN (C-3), COMPRESSOR
START (C4), COMPRESSOR RUN (C-5) AND RELAY; COMPRRSSOR START (KS).
(Cont)
- EVAPORATOR FAN, MOTOR, AND
HOUSING.
- Figure 4-28 Evaporator Fan,
Motor, and Housing
- EVAPORATOR FAN, MOTOR, AND
HOUSING.-Continued
- EVAPORATOR FAN, MOTOR, AND
HOUSING.-Continued
- EVAPORATOR FAN, MOTOR, AND
HOUSING.-Continued
- HEATER THERMOSTAT.
- HEATER THERMOSTAT.-Continued
- HEATER ELEMENTS.
- Figure 4-30. Heater Elements
- HEATER ELEMENTS. (Cont)
- CONDENSER FAN, MOTOR, AND
HOUSIING.
- Figure 4-31. Condenser Fan,
Motor, and Housing
- CONDENSER FAN, MOTOR, AND
HOUSIING. (Cont)
- CONDENSER FAN, MOTOR, AND
HOUSIING. (Cont)
- CONDENSER FAN, MOTOR, AND
HOUSIING. (Cont)
- EVAPORATOR COIL (CLEANING).
- Figure 4-32. Evaporator Coil
- SOLENOID VALVE (COIL
REMOVAL).
- Figure 4-33. Solenoid Valve
Coil Removal
- SOLENOID VALVE (COIL
REMOVAL).-Continued
- LOW PRESSURE CUTOUT SWITCH
(LPCO) JUMPER.
- Figure 4-34. Jumper Across
LPCO Switch
- CONDENSER COIL (CLEANING).
- Figure 4-35. Condenser Coil
- CONDENSER COIL (CLEANING).
(cont)
- CONNECTORS (INSTALLATION).
- CONNECTORS
(INSTALLATION).Continued
- INSTALLATION HARDWARE.
- Section VI: PREPARATION FOR
STORAGE OR SHIPMENT
- Chapter 5: DIRECT SUPPORT
MAINTENANCE INSTRUCTIONS
- Section I: REPAIR PARTS,
SPECIAL TOOLS~ TMDE~ AND SUPPORT EQUIPMENT
- Section II: TROUBLESHOOTING
- Table 5-1. TROUBLESHOOTING
- COMPRESSOR SHORT CYCLES.
- COMPRESSOR SHORT CYCLES.
(Cont)
- INSUFFICIENT COOLING ACTION.
- INSUFFICIENT COOLING ACTION.
(Cont)
- REFRIGERANT SYSTEM
CONTINUOUSLY LOSING REFRIGERANT.
- UNIT OPERATES CONTINUOUSLY ON
COOLING CYCLE.
- AIR CONDITIONER NOISY DURING
OPERATION.
- Section III: MAINTENANCE
PROCEDURES
- SCREENS, GUARDS, AND LOUVERS.
- INFORMATION PLATES.
- EVAPORATOR, FAN, MOTOR, AND
HOUSING REPAIR.
- Figure 5-1. Motor Assembly,
Custom Motor Design
- EVAPORATOR, FAN, MOTOR, AND
HOUSING REPAIR. (Cont)
- Figure 5-11. Motor Assembly,
Keco Industries,
- EVAPORATOR, FAN, MOTOR, AND
HOUSING REPAIR. (Cont)
- CONDENSER FAN, HOTOR, AND
HOUSING REPAIR.
- CONDENSER FAN, MOTOR, AND
HOUSING REPAIR.-Continued
- CONDENSER FAN, MOTOR, AND
HOUSING REPAIR.-Continued
- CONDENSER FAN, MOTOR, AND
HOUSING REPAIR.-Continued
- CONDENSER FAN, MOTOR, AND
HOUSING REPAIR.-Continued
- CONDENSER FAN, MOTOR, AND
HOUSING REPAIR.-Continued
- CONDENSER FAN, MOTOR, AND
HOUSING REPAIR.-Continued
- REFRIGERATION SYSTEM REPAIRS
GENERAL.
- DISCHARGING THE REFRIGERANT
SYSTEM.
- DISCHARGING THE REFRIGERANT
SYSTEM. - Continued
- PURGING THE REFRIGERANT
SYSTEM.
- PURGING THE REFRIGERANT
SYSTEM. (Cont)
- BRAZING/DEBRAZING PROCEDURES.
- BRAZING/DEBRAZING
PROCEDURES.-Continued
- LEAK TESTING.
- LEAK TESTING. (Cont)
- LEAK TESTING. (Cont)
- EVACUATING TEE REFRIGERANT
SYSTEM.
- EVACUATING THE REFRIGERANT
SYSTEM. - Continued
- CHARGING THE REFRIGERANT
SYSTEM
- CHARGING THE REFRIGERANT
SYSTEM.-Continued
- CHARGING THE REFRIGERANT
SYSTEM.-Continued
- REFRIGERATION SYSTEM
TROUBLESHOOTING.
- OVEREEATING CHECKS.
- REFRIGERANT PRESSURE CHECK.
- Table 5-2.
PRESSURE-TEMPERATURE RELATIONSHIP OF SATURATED REFRIGERANT-22
- Table 5-3. NORMAL OPERATING
PRESSURES
- EVAPORATOR COIL.
- EVAPORATOR COIL. -Continued
- EVAPORATOR COIL.-Continued
- FLUID FLOW RESTRICTOR.
- FLUID FLUID
RESTRICTOR.-Continued
- EXPANSION VALUE (PRIMARY).
- Figure 5-10. Expansion Valve
(Primary)
- EXPANSION VALVE (QUENCH).
- Figure 5-11. Expansion Valve
(Quench)
- EXPANSION VALVE
(QUENCH).-Continued
- SOLENOID VALVES.
- Figure 5-12. Solenoid Valves
- PRESSURE REGULATOR.
- Figure 5-13. Pressure
Regulator
- ACTUATING CYLINDER.
- Figure 5-14. Actuating
Cylinder
- PRESSURE SWITCHES.
- Figure 5-15. Pressure
Switches
- PRESSURE SWITCHES. (Cont)
- SERVICE (CHARGING) VALVES.
- Figure 5-16. Service
(Charging) Valves
- PRESSURE RELIEF VALVE.
- Figure 5-17. Pressure Relief
Valve
- Condenser Coil
- Figure 5-18. Condenser Coil
- Condenser Coil (cont)
- DEHYDRATOR (FILTER/DRIER).
- Figure 5-19. Dehydrator
(Filter/Drier)
- LIQUID INDICATOR (SIGHT
GLASS).
- Figure 5-20. LIQUID INDICATOR
.
- Compressor
- Figure 5-21. Compressor
- Compressor (cont)
- Compressor (cont)
- Compressor (cont)
- Compressor (cont)
- Figure 5-22. Refrigerant Flow
System with Dehydrator and Compressor Removed
- COMPRESSOR.-Continued
- COMPRESSOR.-Continued
- COMPRESSOR.-Continued
- COMPRESSOR.-Continued
- TUBING AND FITTINGS.
- Chapter 6. GENERAL SUPPORT
MAINTENANCE INSTRUCTIONS
- Housing
- HOUSING.-Continued
- Appenidx A: REFERENCES
- SPECIFICATIONS.
- Appendix B: MAINTENANCE
ALLOCATION CHART
- MAINTENANCE FUNCTIONS
- EXPLANATION OF COLUMNS IN THE
MAC, SECTION II.
- EXPLANATION OF COLUMNS IN
REMARKS, SECTION IV.
- Section II: MAINTENANCE
ALLOCATION CHART
- Section II: MAINTENANCE
ALLOCATION CHART (cont)
- Section II: MAINTENANCE
ALLOCATION CHART (cont)
- Section II: MAINTENANCE
ALLOCATION CHART (cont)
- Section II: MAINTENANCE
ALLOCATION CHART (cont)
- Section II: MAINTENANCE
ALLOCATION CHART (cont)
- Section III. TOOL AND TEST
EQUIPMENT REQUIREMENTS MAINTENANCE ALLOCATION CHART
- Section IV: REMARKS
MAINTENANCE ALLOCATION CHART
- Appendix C: COMPONENTS OF END
ITEM AND BASIC ISSUE ITEMS LISTS
- EXPLANATION OF COLUMNS.
- Section II: COMPONENTS OF END
ITEM
- Section III: BASIC ISSUE
ITEMS
- Appendix D: ADDITIONAL
AUTHORIZATION LIST
- Appendix E: EXPENDABLE
SUPPLIES AND MATERIALS LIST
- Section II EXPENDABLE
SUPPLIES AND MATERIALS LIST
- GLOSSARY
- INDEX
- 'TM 5-4120-384-14' by LOGSA -
Page 1 of 318
- INDEX (Cont)
- INDEX (Cont)
- INDEX (Cont)
- The Metric System and
Equivalents
- Blank Page
- TM-5-4120-384-14
- Recommended Changes to
Equipment Technical Publications
- Blank Page
- By Order of the Secretary of
the Army:
- Blank Page
- Recommended Changes to
Equipment Technical Publications
|
|