|
|
TM5-4120-384-14
5-33.
COMPRESSOR.-Continued
Remove the nitrogen line from the valve at point 6
Release
and connect it to the valve at point 3.
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
Remove
the
nitrogen
line
from
the
valve
at
point
3.
Close the
suction
line
and
discharge
line
service
valves.
Cap all open
tubing
until
installation
of
new
components.
Replace
Reconnect plugs P8 and P9 to receptacles J8 and J9
respectively.
(See
Installation.
c.
The compressor is supplied with a complete charge of
Take care that oil is not lost when handling
oil.
and installing compressor.
NOTE
Prior to installing compressor inspect resilient
mounts and mounting hardware for deterioration.
Replace if necessary.
NOTE
If any refrigeration piping was disconnected with the
compressor removal, transfer the piping to the
replacement compressor before installing it in the
air conditioner.
(1) Place compressor on resilient
washers
and
bushings
while
aligning with mounting holes.
(2) Tip unit up slightly and install four resilient
washers,
flat
washers, and sockethead screws from bottom.
lock
washers,
and
nuts
and
tighten
(3) Install
washers,
securely.
5-83
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |