TM5-4120-384-14
COMPRESSOR.-Continued
5-33.
Release nitrogen into the system
for approximately
5
minutes or until moisture ceases
to be discharged
from the system.
Remove the nitrogen line from the tubing at point 1
and connect it to the tubing at point 2.
Release
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
De-energize the bypass solenoid valve and release
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
Energize the pressure equalizer solenoid valve by
applying 24 volts dc across pins A and B of plug P9.
Release nitrogen into the system
for approximately
5
minutes or until moisture ceases
to be discharged
from the system.
Remove the nitrogen line from the tubing at point 2
and connect it to the tubing at point 5.
Release
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
De-energize the pressure equalizer solenoid valve
and release nitrogen into the system for
approximately 5 minutes or until moisture ceases to
be discharged from the system.
Remove the nitrogen line from the tubing at point 5
and connect it to the tubing at point 4.
Release
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
Remove the nitrogen line from the tubing at point 4
and connect it to the valve at point 6.
Release
nitrogen into the system for approximately 5 minutes
or until moisture ceases to be discharged from the
system.
5-82
|