|
|
TM5-4120-384-14
5-33.
COMPRESSOR.-Continued
Remove the cap
from the tubing at point 2.
Disconnect the
pump discharge line from the tubing
at point 4 and
connect it to the tubing at point 2.
Cap the tubing
at point 4.
Disconnect the pressure equalizer
solenoid
valve
plug P9 from receptacle J9.
Energize the pressure equalizer solenoid valve by
applying 24 volts dc across pins A and B of plug P9.
Start the pump and flush the line for
approximately
10 minutes, then turn the pump off.
Remove the cap from the tubing at point 5.
Remove the pump discharge line from the tubing at
point 2 and connect it the tubing at point 5.
Remove the recovery line from the valve at point 6
and connect it to the tubing at point 2.
Close the
valve at point 6.
Start the pump and flush the line for
approximately
10 minutes, then turn the pump off.
De-energize the pressure equalizer solenoid valve
by
removing the voltage source from pins A and B of
plug P9.
Disconnect the discharge and recovery lines from
the
tubing and remove all caps from the tubing.
(k) Refer to figure 5-22 and purge the system
with
nitrogen
a p p r o x i m a t e l y 3 0 p s i g ( 2 . 1 1 k g / c m2 ) a s f o l l o w s :
at
Make sure caps are off the tubing at all points and
that the suction and discharge line service valves
are open.
Connect the nitrogen line to the tubing at point 1
and release nitrogen into the system for
approximately 5 minutes or until moisture ceases to
be discharged from the system.
Energize the bypass solenoid valve by applying
24
volts dc across pins A and B of plug P8.
5-81
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |