TM5-4120-384-14
4-3.
SERVICE
UPON
RECEIPT
OF
MATERIAL.-Continued
Unpacking.
b.
Normally, the packaged air conditioner should
(1) General.
be moved into the immediate area in which it is to be installed
before it is unpacked.
NOTE
The shipping container is of such a design that it
may be retained for reuse for mobility purposes if
frequent relocation of the air conditioner is
anticipated.
(2) Remove Shipping Container. Cut the metal bands
that hold
Lift the
container
the top and sides of the container to the base.
vertically and remove it from the base and cabinet.
(3) Remove Packaging.
Remove the cushioning around the top
Remove the
of the cabinet and retain if reuse is anticipated.
preservation barrier by tearing around the bottom of the cabinet.
Remove the technical publications envelope and accessory sack that
are taped to the cabinet and put them in a safe place.
NOTE
It is recommended that the cabinet be left bolted
to
the shipping pallet until time to place it in the
All receiving inspection
installation position.
actions can be conducted without removal from the
pallet.
Receiving Inspection.
Perform receiving
inspection
of
the
c.
air conditioner in the following manner:
(1) Inspect the equipment for damage incurred during
If the equipment has been damaged, report damage on DD
shipment.
Form 6, Packaging Improvement Report.
(2) Check the equipment against the packing slip to see if
Report all discrepancies in accordance
the shipment is complete.
with the instructions of DA Pamphlet 738-750 (The Army Maintenance
Management System).
(3)
Check
to
see
whether
the
equipment
has
been
modified.
4-8
|