TM5-4120-384-14
MAINTENANCE PROCEDURES
Section
III
The procedures in this section have been arranged in the order in
which the items appear in the direct (F) maintenance level column
on the Maintenance Allocation Chart (MAC) which is provided in
Step-by-step procedures have been provided for all
Appendix B.
action authorized to be performed by direct maintenance in the
Actions authorized to be
order in which they appear on the MAC.
performed by organizational and general support maintenance have
been duly noted: step-by-step procedures for organizational and
general support maintenance actions may be found in Chapters 4 and
6 respectively.
For removal, inspection,
lubrication,
cleaning
and
installation
see
Minor rips, cuts) tears, or punctures
may
be
Repair.
a.
repaired by applying a patch to the inside surface.
For damage of greater extent,
or
missing
eyelets
Replace.
b.
snap fasteners. replace the entire cover.
or
inspection,
and
installation
see
For removal,
cleaning,
4-11.
a. R e p a i r . T h e o n l y a u t h o r i z e d r e p a i r s f o r t h e s e p a n e l s
are
replacement of gaskets, insulation and information plates.
(1) Use only gaskets,
insulation,
or
name
plates
identified
in
TM5-4120-384-24P.
NOTE
An initial supply of adhesive is supplied as Item 2,
Section II, Expendable Supplies and Materials List.
(See Appendix E.)
(2) Remove as much old gasket or insulation material as
possible by pulling or scraping it away from the metal surface.
5-12
|