|
|
TM5-4120-384-14
4-24.
COMPR CIRCUIT BKR CB1.-Continued
Test.
b.
(1) Check to see that continuity exists on each
pair
of
terminals when circuit breaker is in the on position.
(2) Check
to see that there is no continuity between
terminals with
circuit breaker in the off position.
Replace.
Replace COMPR CIRCUIT BKR if defective.
c.
Installation.
d.
(1)
Insert circuit breaker toggles through
control
panel.
Be
sure
off
position matches lettering on panel.
(2)
Secure
circuit
breaker
to
panel
with
screws
and
washers.
Insert pin
and
spacers
through
circuit
breaker
toggles
to
(3)
lock
them together.
(4) See wiring diagram
and
tags
and
connect
wire
leads.
Remove tags.
(5) Align holes in the
mounting
frame
with
the
three
posts
and
secure with screws.
(6) Check that grommets
Install
are in place in shaft
holes.
TEMPERATURE SELECTOR k n o b a n d
tighten setscrew.
(7)
Slip
c o v e r back
in
place
and
secure
with
four
screws.
(8)
See
and
install
control
module.
(9)
Connect
power
at
power
source.
4-25. CONTROL MODULE WIRING HARNESS.
Disconnect input power from the air conditioner
before performing maintenance on any part of the
The voltages used can be lethal.
electrical system.
Inspect.
a.
(See
(1)
Disconnect
power
at
power
source.
4-73
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |