Click here to make tpub.com your Home Page

Page Title: RELAY. (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-384-14
4-28.
-
Continued
Test.
a.
(1)
Disconnect
power
at
power
source.
(2)
See
and
remove
control
module.
(3) Remove top front cover on F18H-3S and F18H-1S or top
cover on F18H-3SA and F18H-3SB (para 4-11).
(4)
Remove  seven  screws
and
lock
washers
and
carefully
slide
junction
box  out  of  unit.
(5)
K2
and
K3.
(a)  Apply
28VDC
to
terminals
X1
and
X2;
X1
is
positive,
X2
is
negative.
(b)  Check  continuity  across  terminals  A1  and  A2;  B1  and  B2,
and C1 and C2.
The  multimeter  must  show  that  contacts  are  closed.
(c)
Remove
power.
Multimeter
must
show
that
contacts
are
open.
(6)
K4
and
KS.
(a)
Apply
28VDC
to
terminals
2
and
9;
2
is
positive,
9
is
negative.
(b)  Check
across
terminals,
1
and
3;
5
and
11:
and 10 and 8.
(c)  Read  Multimeter.
It  should  indicate  that  terminals  1
and 3,  5 and 11,  a n d 1 0 a n d 8 a r e c l o s e d .
Terminals 1 and 4, 5 and
6, and 10 and 7 are open.
(d) Remove 28VDC power.
Multimeter  should  indicate  that
terminals 1 and 4,  5 and 6, and 10 and 7 are closed and that
terminals 1 and 3,  5 and 11, and 10 and 8 are open.
(7)
Time
delay
relay
K1.
(a)
Connect
multimeter
to
terminal
A1
and
A2
of
relay
K3.
(b) Apply +28VDC to terminal 2 of K1 and 28VDC ground to
terminal X2 of K3.
Terminal  2  of  K1  is  positive  and  terminal  X2
of
K3  is  negative.
4-81
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business