Click here to make tpub.com your Home Page

Page Title: EVAPORATOR COIL.-Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-384-14
5-20.
EVAPORATOR
COIL.-Continued
(2)  Secure  mist  eliminator  holder  and  evaporator  coil  to
housing  with  four  pan  head  screws,  lock  washers,  and  flat  washers.
Secure  evaporator  coil  to  housing  with  two  each  screws,  lock
washers,  and  flat  washers.
The  four  holes  in  the  mist  eliminator
holder  match  the  bottom  four  holes  in  the  coil.
(3)  Align  tubing  connections  to  tee  and  expansion  valve.
Braze  joints  in  accordance  with  paraqraph  5-13.
Take  care  that
expansion  valve  is  protected  during  brazing  operation.
(4)
Replace
(See
Leak  test  coil,  dehydrator,  newly  brazed  joints,  and
(5)
j o i n t s  i n the  area  of  newly  brazed  joints  per  paragraph  5-14.
(6)
Rewrap
insulation
that
was
removed
prior
to
debrazing.
TOP mark must be
Slide  mist  eliminator  into  its  holder.
(7)
up
and  air  flow  arrows  must  point  away  from  coil.
(8)  (Models  F18H-3S  and  F18H-1S)  Install  supply  air  louver
and  top  front  cover  (para  4-14  and  4-11).
(Models F18H-3SA and
F18H-3SB)  Install  supply  air  louver  and  top  cover  (para  4-14  and
4-11).
(9)  Evacuate  and  charge  refrigeration
system
in
accordance
with
paragraphs  5-15  and  5-16.
5-45
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business