Page Title: Section III OPERATION UNDER USUAL CONDITIONS.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4120-384-14
Section
III
OPERATION UNDER USUAL CONDITIONS.
2-5. ASSEMBLY AND PREPARATION FOR USE.
The  air  conditioner  is  a  completely  assembled,  self-contained  unit
as  received.
No  specific  operator  preparation  for  use  is  required
once  the  unit  is  in  place.
2-6.
OPERATIONAL
CHECKS.
(See
and
2-2.)
The  air  conditioner  should  be  checked  for  operation  in  all  modes
after  installation  is  completed  and  when  it  is  to  be  placed  back
in
operation  after  an  extended  shut  down  period.
Do not perform the operational check in COOL mode
until  input  power  has  been  supplied  to  the  unit  for
at  least  four  hours.
Liquid  refrigerant  tends  to
migrate  into  the  compressor  crankcase  and  cylinders
during  periods  when  the  compressor  heater  is  not
operating.
Under  moderate  climatic  conditions,  the
compressor  heater  will  normally  "boil"  all  liquid
refrigerant  out  within  a  four  hour  period.
If  the
air  conditioner  has  been  exposed  to  below  freezing
temperatures  without  input  power,  an  eight  hour  warm
up  period  is  recommended.
Unsnap and roll up the fabric cover on the back of the
a.
cabinet.
Secure  it  in  the  stowed  position  with  the  two  straps.
b.
Individually
adjust  all  louvers  in  conditioned  air
supply
louver
assembly  to
the  fully  open  (horizontal)  position.
c.
Using  the  operating  levers,  adjust  the
louvers  in  both
sections  of  the  return  air  louver  assembly  to
the  fully  open
position.
d.
Turn
the
fresh
air
damper
control
to
the
fully
closed
(up)
position.
e.
Check  that  the  unit  is  connected  to  the  proper  power  source
and  that  power  has  been  connected  to  the  unit  for  four  hours.
f.
C h e c k to see that the CONTROL CIRCUIT BREAKER and the COMPR
CIRCUIT BKR are in the ON position.
Change 1
2-9