|
|
TM5-4120-384-14
4-26.
JUNCTION
BOX.
Continued
(3)
See
and
install
control
module.
(4) Install top front cover on F18H-3S
and
F18H-1S
or
top
cover on F18H-S3A and F18H-3SB (para 4-11).
(5)
Connect
power
at
power
source.
4-37. JUNCTION BOX WIRING HARNESS.
Disconnect input power from the air conditioner
before performing maintenance on any part of the
electrical system.
The voltages used can be lethal.
a.
Inspect.
(See
(1)
Disconnect
power
at
power
source.
(2)
See
and
remove
control
module.
(3) Remove top front cover on F18H-3S and F18H-1S or top
cover on F18H-3SA and F18H-3SB (para 4-11).
(4)
Remove seven screws
and
lock
washers
and
carefully
slide
junction
box out of unit.
(5) Inspect connector
for
loose,
damaged
or
missing
pins.
Replace if defective.
(6) Check individual wires for loose solder connections,
loose terminal lugs, cut or frayed insulation, cut or broken wires.
b.
Removal.
Tag and disconnect
individual
wires
and
connectors
from unit. (See fig. 4-23.)
Continuity test
c. T e s t i n g . S e e w i r i n g d i a g r a m f i g u r e 4 - 4 .
Replace or repair wires with
no continuity.
individual wires.
d.
Repair.
(1)
See
for
general
wire
repair
instructions.
(2) See table 4-3 Wire List for wire lengths
and
terminal
information when individual wires are replaced.
Replace.
e.
Replace
individual
wires,
terminals
or
connectors
if
defective.
4-78
Change 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |